>Hotel Design Process 酒店设计流程
  • 第一阶段 设计启动 Phase Ⅰ: Design Initiation

    在设计进行初期,安排设计团队主要成员与贵司经营管理团队、建筑师代表、项目主要领导的咨询会议。以确定各区域的各项设计要求,明确设计目标;并使各工作团队加强接触增进了解。

    成都水木源创In the initial stage of interior design, our company arranges a consultation meeting between your executive management team (including the architect representative and the project leader) and the main members from our design team to determine the design requirements and aims of each area。 Besides, we use this opportunity to strengthen our contact and enhance mutual understanding。


  • 第二阶段 概念设计 Phase Ⅱ: Conception Design

    根据前期了解的资料,对综合性项目进行可行性分析,在总体规划方面,提出交通动线的畅通性, 设计会客观理性的加以剖析,并提出合理优化方案。结合经营的要求,提出动线和区块划分的平面图,并同经营管理团队进行先期沟通,以便更准确有效地进行后续工作。提报后设计将根据明确后的调整意见,对概念方向加以修正并以正式文本方式向贵司提出,作为后续工作的设计依据。

    成都水木源创Based on the information collected in the early stage, our team analyzes the feasibility of this comprehensive project. We put forward the efficiency of moving lines and provide a reasonable optimized scheme by objective and rational analysis. We draft the plan of moving lines and area dividing according to the hotel management requirement. To ensure proper follow up, we will discuss with your executive management team in this phase. Referring to the decided adjustment, we will modify the design conception and direction and provide a formal text as the design basis for your company.


  • 第三阶段 方案设计 Phase Ⅲ: Conceptual Design

    方案设计是建立在概念设计的基础上,对酒店设计及技术上的深化。达到相关部门对图纸的报批深度要求。方案设计是概念设计中的方向定位。落实到方案设计中每一个细节。确定规划指标、空间形态空间视觉的氛围。同时地关系到整个运营最终的成败

    Conceptual design is based on the design conception and proceeds with the interior design technically to meet the requirements of the authorized examining and approving organ. In this phase our team designs every detail of the project according to the design orientation and position decided in the conception stage. We determine the planning index, space form and visual atmosphere that concern the success of the hotel operation.


  • 第四阶段 扩初设计 Phase Ⅳ: Preliminary Design

    这个阶段是方案和实施设计的衔接阶段,在完成方案设计及修改之后,将工作推进到施工图纸的制作。因为本项目还涉及到多个设计单位协作,将设计意图用图面形式表达出来,以便各协作设计单位如机电设备、指示系统、空调暖通、消防、幕墙、景观等后续深化设计团队能更容易的衔接。如果商业经营的团队结合招商需求,可能会对设计要求有所变化,也请在此阶段尽量提出,积极的配合设计调整。

    This phase connects the conceptual design phase with the implementation phase。 After the conceptual design and modifications, we push forward the work on drawing。 Considering the cooperation with other design units, we express our design ideas through construction drawings, to provide convenience for the detailed design teams such as electromechanical device, indication system, heating ventilation, fire control, curtain wall and landscape architecture。 If your commercial operating team has special investment demands, please put forward your advice in this phase and cooperate with us to modify the design scheme。


  • 第五阶段 施工图设计 Phase Ⅴ: Drawing Design

    成都水木源创第五阶段设计成果确认后,将准备有关施工的设计文件,列明各项装饰需求,并将与工程单位及贵司项目团队协调,以达成项目工程的顺利开展。图纸内容将明确表达设计部位的形式与材料工法。

    After confirming the result of Phase Ⅳ, we prepare the documents for relevant construction, list the requirements of each decoration item, and coordinate with the engineering unit and your project team, to ensure a smooth execution of the project。 The content of the drawings will explain the pattern and materiel for each design detail。


  • 第六阶段 设计服务 Phase Ⅵ: Design Service

    在整个工程开工后,酒店设计单位将在各工程关键节点时委派有丰富现场经验的项目组成员到达现场,进行重点监造服务,服务内容包含了材料及工法的确认,现场设计的调整与协调,以及配合贵司进行开业前设计验收工作。

    After the project construction work starts, our hotel design team will assign experienced members to supervision service at the construction site in every crucial stage of the project. The service includes the confirmation of materials and technics, the design adjustment for the real situation, and the cooperation with your company in the completion inspection before the hotel opening.


水木源创机构设置
  • 联系电话
    028-85245581 15982279206
  • 酒店设计咨询 微信公众号
在线咨询
秒速赛车_永久网址9h123.com_电子烟等新型烟草正在“培育”新烟民-新华网 秒速赛车_永久网址9h123.com 秒速赛车_进入官网9h123.com_网文揭美国警察如何对待占街新闻频道__中国青年网 秒速赛车_进入官网9h123.com 秒速赛车_进入官网9h123.com_那些年为毛泽东服务过的秘密小组【3】--文史--人民网 成都水木源创秒速赛车_进入官网9h123.com月球上的棉花嫩芽是这样“种”出来的 秒速赛车_进入官网9h123.com_调查显示55%委内瑞拉人认为政府正在走向独裁_成都水木源创_中国网 秒速赛车_进入官网9h123.com_徐矿集团再次上榜2019中国企业500强--- 幸运飞艇_进入官网9h123.com - 毛泽东诞辰110周年纪念 幸运飞艇_复制打开9h123.com恶劣天气 外卖小哥需要怎样的安全感_国内新闻_大众网 成都水木源创加拿大28-进入官网9h123.com_最袖珍房屋挂牌出售 引火爆关注(图)-南海网 加拿大28_进入官网9h123.com_联邦技术移民积案作废 引发全球抗议_中国网 加拿大28开奖_9h123.com_华裔不懂英语也可沟通但难融入 加拿大28开奖结果查询_9h123.com 加拿大28开奖结果查询_复制打开9h123.com 成都水木源创重庆时时彩中奖规则_开奖官网9h123.com_彩票频道_新浪网 成都水木源创秒速快3_复制打开官网9h123.com_湖北宜昌秭归脐橙走进武汉国企 成都水木源创大发彩票_复制打开官网-2010年华教记忆 幸运28_复制打开官网_陌生男主动来聊天 男子傻乎乎充了3万 幸运彩票_复制打开官网9h123.com_微信上传福彩3D票号 零元抽取幸运彩票 澳门百家乐_复制打开官网9h123.com_句容农业巧打生态牌-新华网 澳门百家乐_永久网址9h123.com - 新华网数据新闻 澳门百家乐_永久官网9h123.com--旅游频道_权威全面报道旅游--人民网 三码必中_进入官网9h123.com_新浪竞技风暴_新浪网 三码必中_进入官网9h123.com_独创“双叠加三解码”质量管理模式_凤凰财经 万利彩票_进入官网9h123.com_买中榜者姓氏赢彩金--文化--人民网 易发彩票_进入官网9h123.com_“戏精”官员迟早会“穿帮”廉政_新浪新闻 易发彩票_进入官网9h123.com_农业部预计2017年中国粮食产量1.2万亿斤以上-新华网 成都水木源创盛世彩票_进入官网9h123.com_今年小学入学网上报名开始啦 88彩票_进入官网9h123.com_新浪竞技风暴_新浪网